Expo info
设备保养
Pile Turner
- Categories:Equipment maintenance
- Author:
- Origin:
- Time of issue:2019-07-22 11:12
- Views:22
(Summary description)1、Add butter for machinery on the slide seat of the linear guide.
2、Add butter for machinery on the reaming ears at both ends of the hydraulic cylinder。
3、Rotating shaft of turning body add butter for machinery.
4、Pin shafts add oil weekly.
5、Add butter for machinery on slider and guide rail at both ends of blowing nozzle.
6、Chain add oil.
7、The screw in the gauge position add oil.
8、The oil tank is filled with 32 # or 46 # anti-wear hydraulic oil which is replaced once a year and the filter screen in the oil tank is cleaned every 3-6 months.
9、Dust in the electric box is cleaned once a year with vacuum cleaner.
Pile Turner
(Summary description)1、Add butter for machinery on the slide seat of the linear guide.
2、Add butter for machinery on the reaming ears at both ends of the hydraulic cylinder。
3、Rotating shaft of turning body add butter for machinery.
4、Pin shafts add oil weekly.
5、Add butter for machinery on slider and guide rail at both ends of blowing nozzle.
6、Chain add oil.
7、The screw in the gauge position add oil.
8、The oil tank is filled with 32 # or 46 # anti-wear hydraulic oil which is replaced once a year and the filter screen in the oil tank is cleaned every 3-6 months.
9、Dust in the electric box is cleaned once a year with vacuum cleaner.
- Categories:Equipment maintenance
- Author:
- Origin:
- Time of issue:2019-07-22 11:12
- Views:22
1、Add butter for machinery on the slide seat of the linear guide.
2、Add butter for machinery on the reaming ears at both ends of the hydraulic cylinder。
3、Rotating shaft of turning body add butter for machinery.
4、Pin shafts add oil weekly.
5、Add butter for machinery on slider and guide rail at both ends of blowing nozzle.
6、Chain add oil.
7、The screw in the gauge position add oil.
8、The oil tank is filled with 32 # or 46 # anti-wear hydraulic oil which is replaced once a year and the filter screen in the oil tank is cleaned every 3-6 months.
9、Dust in the electric box is cleaned once a year with vacuum cleaner.
Do you have questions about projects or our products and services?

PROVIDING VALUE ADDING SOLUTION TO CUSTOMERS
Add.:Xinxing Industry Zone,Yutian,Tangshan,Heibei,China
Tel:0086-315-6196865
E-mail:info@uanchor.com.cn
Yutian UANCHOR Packaging Machinery Co., Ltd. 冀ICP备09039892号 Powered by www.300.cn